Methodology

Within the project time frame, the following activities will be completed to be able to reach the targets as set out above:

  1. Development of an electrodialysis (ED) system based on reverse electrodialysis (RED) and ED components (membrane, electrodes, stacks).
  2. Assessment of pilot systems in a real environment to demonstrate improvements regarding energy consumption, water quality and cost, among others.
  3. Study of the economic viability of the different ED desalination systems, their business perspectives and the market strategy to follow.