Within the project time frame, the following activities will be completed to be able to reach the targets as set out above:
- Development of an electrodialysis (ED) system based on reverse electrodialysis (RED) and ED components (membrane, electrodes, stacks).
- Assessment of pilot systems in a real environment to demonstrate improvements regarding energy consumption, water quality and cost, among others.
- Study of the economic viability of the different ED desalination systems, their business perspectives and the market strategy to follow.